UK Patent Filed · GB2612794.4 & GB2612954.4

Grid-scale energy storage.
Gravity. Water. Physics.

A novel combination of offshore wind generation and pumped hydro storage — using existing infrastructure, existing land, and 100-year-old technology put together in a new way.

"Basic maths and physics. Uses nothing new. Just put together in a new way."
— Barry Llewellyn, inventor
15 GWh
Storage capacity
1,200 MW
Output
100 yrs
Asset life
£0
Fuel cost
The Technology

Two systems. One principle.

When the wind blows, pump water uphill. When power is needed, let it flow back down. The innovation is not the technology — it is the configuration. Linking offshore and onshore wind farms directly to pumped hydro storage using existing consented infrastructure.

System 1 — Offshore
Seawater Pipeline Storage

Surplus offshore wind power drives pumps at the coast. Seawater travels inland through a buried pipeline following the existing consented cable corridor. Stored at elevation. Released on demand through reversible turbines at the existing grid connection.

PrototypeRampion 2, Sussex
Generation1,200 MW
Pipeline24 km buried
Head210 m AOD
Storage~15 GWh
System 2 — Onshore Cascade
Multi-Stage Cascade Storage

Freshwater pumped hydro across existing onshore wind farm topography. Multiple reservoir stages cascade down verified OS hill profiles. Each stage generates and pumps independently. Up to eight stages from a single site using natural rainfall catchment.

PrototypeWhitelee, Scotland
Generation539 MW
StagesUp to 8
Max head247 m
Output206–412 MW
Operating cycle
💨
Wind
generates
Surplus
diverted
💧
Water
pumped up
🏔️
Energy
stored
🔄
Water
released
🔌
Power
delivered
Why It Matters

Six reasons Britain needs this.

This is not just an energy storage project. It is a replicable national infrastructure programme with lasting value across every government mandate.

Energy
Firm dispatchable power from wind

Turns intermittent wind into guaranteed 24/7 power. Grid stability. Net zero. No curtailment waste. Qualifies for capacity market and CfD premiums.

🌿
Nature
Enhancement, not damage

Naturalised reservoir banks. Native planting. Bat corridors. Wading bird and osprey habitat. Delivers Biodiversity Net Gain exceeding mandatory requirements.

🔨
Jobs
Long-term skilled employment

Apprenticeships. Skilled trades. NEET reduction. Decades of local employment in coastal and post-industrial communities. Not temporary contracts.

💷
Money
Wages stay in communities

British Steel. British supply chain. Local wages circulating locally. Grant eligible across Green Jobs, UK Shared Prosperity Fund and Net Zero streams.

🛡️
Security
NATO industrial resilience

Energy independence. Domestic steel and engineering capability. Underground infrastructure. A stronger NATO partner — through civilian investment, not defence spending.

🚶
Community
Public access and visitor economy

Pipeline corridors as coastal footpaths and wildlife routes. Visitor centres. Cafés. Education. Connecting the England Coast Path to the South Downs Way.

The Maths

See the numbers for any site.

Enter a wind farm's capacity and the available head at a candidate site to see the indicative storage potential. Basic maths. Real physics.

Storage Potential Calculator
Usable storageGWh
Generation duration at rated outputhours
Indicative annual extra revenue*£m/yr
Asset life100+years

* Indicative only. Based on firm generation premium of £85/MWh vs £55/MWh intermittent. Full financial modelling available under NDA.

Site Data

Verified UK prototype sites.

Full CAD data, OS-verified elevations, pipeline geometry and energy calculations are available for prototype sites. Access requires a signed NDA.

🔒

Technical Site Data

This section contains verified CAD parameters, OS elevation data and pipeline specifications for UK prototype sites. Access is restricted to parties who have signed the mutual NDA.

Incorrect access code. Please request access via the NDA contact form below.

Don't have an access code? Complete the NDA request below and Barry will be in touch within 48 hours.

✓ NDA access granted. All information viewed is subject to the confidentiality agreement signed prior to this access.
Rampion 2 — System 1 Prototype
Climping Beach, West Sussex → Bignor Hill, South Downs

The concept's primary prototype. Uses Rampion 2's existing consented landfall at Climping Beach and grid connection at Bolney substation. Pipeline follows the existing consented cable corridor — no separate planning consent required.

1,200 MW
Wind capacity
24 km
Pipeline length
210 m
Head (AOD)
~15 GWh
Storage
Whitelee — System 2 Prototype
Eaglesham Moor, East Renfrewshire, Scotland · NS545480

The UK's largest onshore wind farm. Seven OS-verified hills across 55 sq km provide up to 8 cascade stages. 247m maximum head between Mossy Hill (467m AOD) and Howeburn Moss (220m AOD).

539 MW
Wind capacity
247 m
Max head
8 stages
Cascade
3.3 GWh
Max storage
Legal Protection

Patent protected. Priority dates secured.

UK Patent Applications

GB2612794.4
Filed 02 June 2026 · Onshore multi-stage cascade system · Security check completed
GB2612954.4
Filed 03 June 2026 · Offshore seawater pipeline system · Security check completed · Reference: Offshore

Priority dates established June 2026. Full technical details available under mutual NDA only.

Government & Industry Engagement

  • Prime Minister's Office — forwarded to relevant department
  • BIPC appointment — 7 July 2026 — Worthing Library
  • IPO Green Channel application submitted
  • Minister for Climate — Katie White OBE MP
  • Minister of State for Energy — Michael Shanks MP
  • RWE — Rampion 2 lead developer
  • GoBe Consultants — Rampion 2 EIA specialists
Get In Touch

Request the technical pack.

Full CAD drawings, pipeline geometry, reservoir sizing, energy calculations and site analysis are available under a mutual non-disclosure agreement. Complete the form below and Barry will be in touch within 48 hours.

Confidentiality Agreement

By submitting this form you agree that all information shared by Barry Llewellyn regarding the Gravity Storage Systems concept is confidential, will not be shared with any third party, and will not be used for any purpose other than evaluating a potential commercial arrangement. This agreement is binding under the laws of England and Wales from the moment of submission.

✓ Request received

Your NDA agreement has been logged and Barry will be in touch at the email address provided within 48 hours with the technical pack and access code for the site data section.

For urgent enquiries: barry@gravitystoragesystems.co.uk · 07852763861